Cleaning Steel Bridge Segments
Konrad Rump Oberflächentechnik GmbH & Co KG
![img](/sixcms/media.php/5792/thumbnails/10.1365_s35724-014-0267-y.pdf.15207896.gif)
The largest Russian manufacturer of steel bridges has invested in a new blasting machine to remove scale, welding residues and other contamination. As a result, the bridge components, which are up to 21 metres in length, are perfectly prepared for the next phase in the manufacturing process.